Chevis Rd. Drop-Off Center
Scope & Overview
This product undertook a renovation project for the Chevis Rd. Drop-Off Center. This facility required significant upgrades to enhance its functionality and safety for public use.
The renovation of the Chevis Rd. Drop-Off Center involved several critical tasks aimed at improving the structural integrity and usability of the facility. The key components of the project included:
View All
Removal of Broken Precast Wall:
The project began with the removal of the existing broken precast wall. This was a necessary step to address safety concerns and prepare the site for new construction.
Poured-in-Place Foundation and Retaining Walls:
Following the demolition, a new foundation and retaining walls were constructed using poured-in-place concrete. This method provided enhanced durability and stability compared to the previous precast wall.
Installation of New Handrail:
To ensure the safety of users, a new handrail was installed along the retaining walls. This addition was designed to provide support and prevent accidents, enhancing the overall safety of the drop-off center.
View All
Timeline
The project was executed in phases to ensure minimal disruption to the center’s operations. The process included the demolition of the old wall, construction of the new foundation and retaining walls, and the final installation of the handrail.
Challenges and Solutions
Site Preparation and Demolition:
The removal of the broken precast wall required careful planning to avoid damage to the surrounding area. The team used specialized equipment and techniques to safely dismantle and remove the old structure.
Construction of Poured-in-Place Walls:
Constructing the poured-in-place foundation and retaining walls presented a challenge in ensuring the concrete cured correctly and achieved the desired strength. The team implemented best practices in concrete pouring and curing to ensure a robust and durable structure.
Safety Enhancements:
Installing the new handrail was critical for user safety. The team selected high-quality materials and adhered to stringent safety standards to ensure the handrail was both sturdy and reliable.
Project Highlights
Project Visual Journey
Chevis Road Drop-Off Center-Before
Chevis Road Drop-Off Center-During
Chevis Road Drop-Off Center-After